Things have been going great the last week or so! We got the roof trusses all lifted up and are ready to be put into place. All the small roofs around the house have now been framed. When the crane came to lift the roof they also lifted the tubs into place, its kinda surreal seeing actual insides sitting between the framing. The cabinet people also came and did a measurement so we can finish designing and order the cabinets.
Next week should be a big week! We will be getting gravel into the basement so we can pour the concrete, the stairs to the basement should be finished as well. All the sheeting on the roof should be installed and the windows and doors delivered and installed. Also the plumber and the HVAC installers are meeting to start organizing where everything goes.
 |