Now that the second story floor is on we finally get to see some of the walls go up! Last week was a bit slow as one of the framers had to go out of town for a wedding, but thanks to the help of a crane we ended up getting a fair amount done. The Crane helped lift one of the pieces to the long side wall, and brought up a lot of the lumber that we need to build the rest of the walls so that David doesn't have to lift everything up. We then got a nice dump of snow last Friday-Sunday I'm sure it was at least a foot... we should have some good progress this week tho!
 |
| 2nd Bedroom Wall |
 |
| Side wall! |
 |
| The crane bringing up material after the walls were up. |
 |
| Snow.... And the HUGE bedroom window! |
No comments:
Post a Comment