There has been a lot happening on the outside of the house while the plumber and HVAC were installed inside. Electrical should be started and finished in the next few days so we will get to start insulating then drywalling!!
![]() |
| The city hooked up the electricity! Now we have our own power. |
![]() |
| Power gave us the capability to plug in the sump pump just as the rain came, thankfully the pit remains dry |
![]() |
| We got a few more loads of dirt to even out the back and fill the garage pad |
![]() |
| Dad and Trent came to help fill in the side of the house that the machines couldnt get to |
![]() |
| HVAC in and water and sewer lines pretty much finished |
![]() |
| Doug starting on the Hardie! |
![]() |
| We needed to dig to straighten the cement pillar for the deck so got our electrical and gas to the garage dug at the same time |
![]() |
| David installed the vent and drywall for behind the fireplace |
![]() |
| The Hardie is looking sharp, got this whole area done today but will update the photos soon |
![]() |
| Took two loads to the dump today, I think we now have the cleanest construction site on the block! |